What is your education level?
What priority (order of importance) would you consider when deciding the method of asbestos abatement? (1 - Highest, 5 - Lowest)
Construction Technology
-- Select -- 1 2 3 4 5 Efficiency
-- Select -- 1 2 3 4 5 Site Environment
-- Select -- 1 2 3 4 5 Cost
-- Select -- 1 2 3 4 5 Safety
-- Select -- 1 2 3 4 5
In case of low headroom, say about 2.5m, could the equipment required for Removal/Demolish method be used in this situation?
In case of low headroom, say about 2.5m, could the equipment required for Encapsulation method be used in this situation?
In case of low headroom, say about 2.5m, could the equipment required for Enclosure method be used in this situation?
Which asbestos abatement method is used more frequently in Hong Kong?
Worker protection is needed for asbestos abatement. What factors will you consider with the degree of worker protection? (1 ¡V most important, 5 ¡V least important)
Construction Technology
-- Select -- 1 2 3 4 5 Efficiency
-- Select -- 1 2 3 4 5 Site Environment
-- Select -- 1 2 3 4 5 Cost
-- Select -- 1 2 3 4 5 Safety
-- Select -- 1 2 3 4 5
Which level of protection does each asbestos abatement method requires? (1 ¡Vhighest level, 3 ¡V lowest level)
Removal
-- Select -- 1 2 3 Encapsulation
-- Select -- 1 2 3 Enclosure
-- Select -- 1 2 3
Is containment barrier needed for Removal work?
Under a usual condition, which asbestos abatement method is the cheapest in term of INITIAL cost? Please arrange the methods in correct order. (1 ¡V cheapest, 3 - most expensive)
Removal
-- Select -- 1 2 3 Encapsulation
-- Select -- 1 2 3 Enclosure
-- Select -- 1 2 3
Under a usual condition, which asbestos abatement method is the cheapest in term of RUNNING/MAINTENANCE cost? Please arrange the methods in correct order. (1 ¡V cheapest, 3 - most expensive)
Removal
-- Select -- 1 2 3 Encapsulation
-- Select -- 1 2 3 Enclosure
-- Select -- 1 2 3
Under a usual condition, which asbestos abatement method is the FASTEST in to complete? Please arrange the methods in correct order. (1 ¡V fastest, 3 - slowest)
Removal
-- Select -- 1 2 3 Encapsulation
-- Select -- 1 2 3 Enclosure
-- Select -- 1 2 3
If enclosure method is used in this case, how much does the maintenance of enclosure method cost per year?
If encapsulation method is used in this case, how much does the maintenance of enclosure method cost per year?
Does the initial cost include the inspection fee?
Does the initial cost include the experiment fee?
Does the initial cost include the transportation cost of the chemical waste away?
In this case, a floor area of 720m2 is suspected asbestos containing (Assume all the asbestos containing materials are in good condition), which of the following method(s) is preferable?
In this case, what priority would you prefer when deciding the method of asbestos abatement? (1 ¡V most important, 5 ¡V least important)
Technology Available
-- Select -- 1 2 3 4 5 Efficiency
-- Select -- 1 2 3 4 5 Site Environment
-- Select -- 1 2 3 4 5 Cost
-- Select -- 1 2 3 4 5 Safety
-- Select -- 1 2 3 4 5
Is the method chosen in Q.20 save more money in long run (15 years) when comparing with other methods?
What factor(s) would you base when you calculate the cost of asbestos abatement for Removal method?
What factor(s) would you base when you calculate the cost of asbestos abatement for Encapsulation method?
What factor(s) would you base when you calculate the cost of asbestos abatement for Enclosure method?
* For the case of Mei Ho House, how much will you propose for Removal method? (Answer can be approximate, eg. $4000-5000 per m2 (or other unit))
* 25. For the case of Mei Ho House, how much will you propose for Encapsulation method? (Answer can be approximate, eg. $4000-5000 per m2 (or other unit))
* For the case of Mei Ho House, how much will you propose for Enclosure method? (Answer can be approximate, eg. $4000-5000 per m2 (or other unit))
Would you have any information and concern to provide?
Would you mind to have an interview? (If yes, please answer Q.27)
If yes, what way would you like, by phone or in-person?
Please leave us your company name so that your company will be acknowleged in our project.