This free survey is powered by QUESTIONPRO.COM

Production and Distribution Plants


0%
Exit Survey »
 
 
Hello:
You are invited to participate in our survey production and distribution plants.
The scope of this survey is to gather the main information from production and distribution plants useful for the planning and budgeting the future T&T systems to be implemented.


Your survey responses will be strictly confidential and data from this research will be reported only in the aggregate. Your information will be coded and will remain confidential. If you have questions at any time about the survey or the procedures, you may contact Mr. Adriano Fusco by email at the email address specified below.

Thank you very much for your time and support. Please start with the survey now by clicking on the Continue button below.

 
 
General Data
* Company and Plant Name : 
* First and last name : 
Plant address 1 : 
Plant address 2 : 
City : 
State : 
Zip : 
Phone : 
* Email Address : 
 
 
 
1. PRODUCTION/DISTRIBUTION ENVIRONMENT

Please provide the following data on your plant / distribution center
 
 
Yearly production (n. of selling units produced)
   
Yearly distribution (n. of shipped items)
   
Surface of the plant (square meters)
   
N. of employees
   
N. of production lines
   
 
 
 
Please detail the type of production:
 
 
N. of lines producing cartons (as final package)
   
N. of lines producing bottles
   
N. of lines producing other forms (please specify)
   
 
 
 
2.1. Expected evolution
 
 
Which short term evolution (6 months-1 year) you foresee in terms of line evolution (ie. new lines acquired, old lines phased out, machines revamping, etc.)?
   
On a longer term (2-3 years), which evolution you foresee?
   
 
 
 
2.2. Domain
 
 
Which are the countries you are serving (please specify in order of importance)?
   
Which evolution you foresee in the next 2-3 years in this respect?
   
 
 
 
2. SOFTWARE INFRASTRUCTURE
 
 
Please provide a block diagram of the full IS system
 
 
Have you got an implemented MES/PES?
 
 
Please describe functions
   
 
 
Please provide a block diagram
 
Please provide supplier for each item:
ERP MES PES
 
 
 
 
3. PACKAGING LINES’ ASSESSMENT
 
 
3.1. Layout
 
 
Please provide a technical drawing for each single line including dimensions and denomination of the machines and components.
 
 
 
Please include also a general layout of the department – if available.
 
 
 
3.2. Machinery
 
For each item, please detail:
Model Manufacturer Serial number Max. speed (n. of produced item/minute)
Cartoner
Case Packer
Bundler
Palletizer
 
 
 
3.3 Printing Devices
 
For each item present on the line, please detail:
Model Manufacturer
Printers
Labelers
Print & apply modules
 
 
 
3.4 Inspection Systems
 
Please detail for each item present on the line:
Pharmacode/leaflet verification French datamatrix verification OCR/OCV
Performed inspection
Solution provider
Year of installation
Cognex camera type (if present)
 
 
 
Have you got any other inspection system? If so, please specify
   
 
 
 
3.5 Production Formats
 
 
Please fill in attached excel file using one spreadsheet per line
 
 
 
3.6 Video
 
 
A short video detailing the flow of production could be very useful.
A voice comment explaining the flow should be very useful.
 
 
 
4. PREFERRED SUPPLIERS
 
Please detail the main solution suppliers you have for the following items:
Name Website
Visual inspection
End of line appliances
Packaging machines
MES
ERP
 
 
 
5. T&T SYSTEMS ALREADY IN PLACE
 
 
Have you already a Track&trace system in your plant?
 
 
If you replied yes in the previous question, please specify:
 
 
Number of lines where the system is in place
   
Solution provider
   
Year of installation
   
 
 
Which data carrier you use
 
Datamatrix
 
Linear barcode
 
RF-ID
 
Other, please specify
 

 
 
What is the scope of the current system?
 
Comply with regulations
 
Internal requirements
 
Other, please specify
 

 
 
Please specify regulation/ internal requirements if present
   
 
 
Please provide a short description of the system functions (serialization, aggregation)
   
 
 
Please provide a block diagram
 
 
What is the percentage of utilization of the T&T system on the total line operation?
 
<5%
 
5-20%
 
20-50%
 
Over 50%
 
Antares Vision srl - Via Roncadelle 70/A - 25030 Castel Mella (BS) - Italy - P.IVA/ CF: 02890871201 - phone: +390308374694 - email: [email protected]
Survey Software Powered by QuestionPro Survey Software